为了扩大整体预应力板柱结构使用范围,继省科委六层住宅试点工程以后,又在成都印刷一厂排字车间采用这一结构体系。为此于1980年组成了有建设单位、西南建筑设计院、四川建科所和成都市建四公司等参加的技术小组,共同制定方案及研究解决有关技术问题。这一工程系老企业改造,新建车间紧邻街
In order to expand the scope of use of the overall prestressed slab column structure, following the pilot project of the six-story residential building of the Provincial Science and Technology Commission, this structural system was adopted in the workshop of the Chengdu Printing Plant. For this purpose, in 1980, a technical team composed of a construction unit, Southwest Architectural Design Institute, Sichuan Jianke Institute, and Chengdu Jianshe Corporation participated in the development of the program and research and solution of relevant technical issues. This project is the transformation of old companies, and the new workshop is adjacent to the street.