锚索是基坑、边坡支护工程中常用的支护形式,其施工工艺包括成孔、锚索安装与注浆三道工序,现有的施工设备受技术条件限制,将这三道工序分离,造成施工效率低下。在现有锚索施工设备的基础上,对钻进装置进行改进,研制了新型锚索施工设备,能够实现将成孔、锚索安装和注浆三道工序合而为一,在一次钻进、退出钻杆过程中,实现锚索施工的全部过程。新型设备不仅能够直接减少人工、降低成本,亦可缩短工期,并进而减小资金成本。
Anchoring cables are commonly used as supporting forms in foundation pit and slope support engineering. The construction technology includes three steps of forming holes, installing and injecting anchor cables. The existing construction equipment is limited by the technical conditions. The three procedures Separation, resulting in inefficient construction. On the basis of the existing anchor cable construction equipment, the drilling device is improved and a new type of anchor cable construction equipment is developed, which can combine the three processes of forming a hole, installing an anchor cable and injecting grouting into one, Exit the drill pipe process, to achieve the whole process of cable construction. The new equipment not only directly reduce labor costs and reduce costs, but also shorten the construction period, and thus reduce the cost of capital.