通过对国内首例高速公路连续梁跨线桥拆除工程的方案研究 ,分析了在工期、环境等受限情况下 ,采用类似顶推的方法拆除钢筋混凝土连续梁桥的施工方案要点 ,采用了网络图进行进度安排及控制
Through the research on the first domestic continuous highway girder bridge demolition project, this paper analyzes the key points of the construction scheme of removing the continuous reinforced concrete bridge by a similar method in the limited construction period and environment, and adopts the network Figure schedule and control