论文部分内容阅读
本文通过对兰州西站现有新设备运营效果的定性分析,找出了现有设备的薄弱环节。根据运量预测,确定了现有能力的适应年度,提出了适时的配套改造方案,并粗略分析了推荐方案的投资效果。
In this paper, the qualitative analysis of the operation effect of the existing new equipment in Lanzhou West Railway Station finds out the weak points of the existing equipment. According to the forecast of traffic volume, the adaptive year of existing capacity is determined, a timely and complete revamping plan is put forward, and the investment effect of the recommended plan is roughly analyzed.