论文部分内容阅读
该项目主要规划成果包括:(1)对外交通方面,以“两港二枢纽”为中心,公路客货枢纽为朴充,辅以“二专四线”的铁路网络、“二纵三横”的高速公路网和“五线一港区”的水运网络共同组成对外综合交通体系;(2)区域路网方面,规划构筑“四纵三横两连”的快速路网、“一带十二纵十三横”的框架性主干路网以及“十六纵二十一横”的一般性主干路网;其中城区形成“三纵两横”快速路网和“十纵十横”框架性主干路网;
The main planning achievements of the project include: (1) In terms of external traffic, the “Hong Kong and Shenzhen hubs” is the center and the highway passenger and cargo transport hub is Pak Chong, supplemented by the railway network of “ Two vertical and three horizontal ”expressway network and “ five lines and one port ”water transport network together form an integrated transport system; (2) regional road network, planning to build“ four vertical and three horizontal and two ” Of the highway network, “a belt of twelve vertical and thirteen horizontal” backbone of the road network and the “sixteen vertical twenty-one horizontal” of the general trunk road network; which formed the city “Fast Road Network and ” Ten vertical and ten horizontal "framework of the main road network;