论文部分内容阅读
钦州糖厂是日榨500吨甘蔗的中型糖厂。1966年投产后至74/75年榨季,由于锅炉存在问题,造成供电、供汽不足,严重影响生产及安全率;耗电、耗煤多,生产十分被动。1971年虽改炉一次,但未收到效果。74/75年榨季结束后,厂改炉小组对锅炉作了一次较大的改造。经75/76至78/79四个榨季运行,实践证明这次改炉取得了良好效果,全厂生产出现了新局面,煤耗、电耗大大下降(标煤耗对蔗:改炉前73/74榨季为12.07%,74/75为10.67%,改炉后的四个榨季均在7%以下,78/79为7.3%;每吨蔗耗电量:改炉前
Qinzhou sugar mill is squeezing 500 tons of sugar cane medium-sized sugar factory. After put into operation in 1966 to the 74/75 crop season, due to boiler problems, resulting in power supply, lack of steam, seriously affecting the production and safety; power consumption, coal consumption, the production is very passive. Although the furnace in 1971 once, but did not receive results. 74/75 crop after the end of the factory to transform the boiler group made a major transformation of the boiler. After 75/76 to 78/79 operation of the four crop season, the practice proved that the furnace has achieved good results, the whole plant has emerged a new situation, coal consumption, power consumption dropped significantly (standard coal consumption of sugarcane: 73 / 74 for the crop 12.07%, 74/75 for 10.67%, after the furnace four cuttings were below 7%, 78/79 to 7.3%; tons of power consumption per ton: before the furnace