一、长江流域 1.做好蓄滞洪区分洪运用准备。结合工程现状和洪水调度方案,有关省要进一步完善落实蓄滞洪区分洪运用的人员转移与安置预案,做好分洪运用的各项准备工作。长委要组织湖北、湖南两省完成城陵矾附近河段近期100亿立方米超额洪量处理的有关规划设计工作,抓紧确定洪湖隔堤的方案,并组织实施。 2.抓紧完成流域内水毁工程修复。沿江各省市汛前要修复完成水毁工程。中下游各省要按照“平烷行洪、退田还湖”计划,完成洲滩民垸平退任务,采取
First, the Yangtze River Basin 1. Do flood storage and flood diversion preparation. Combined with the status of the project and the flood control program, the province should further improve the implementation of the flood diversion flood storage and relocation plan and do all the preparatory work for flood diversion. The committee has planned to organize the planning and design work on the excess flood discharge of over 10 billion cubic meters in the vicinity of the city of Chengling in Hubei and Hunan provinces, pay close attention to the plan of determining the bank of the Honghu Lake, and organize the implementation. 2. Pay close attention to complete the water damage within the basin repair project. The provinces and cities along the river before the flood to be repaired to complete the water damage project. The middle and lower reaches of the provinces should be in accordance with “flat line floods, returning farmland to lake” plan to complete the beach refugees flat embankment task, to take