论文部分内容阅读
一、概况秦皇岛港煤码头一期工程是我国自行设计、制造设备和施工安装的第一个现代化燃炭出口码头。该码头位于秦皇岛市新开河以东,油码头以西,属于稳定形的海岸带。海底无大量泥沙,唯有从石河向西的一股细沙流,主要是在-4米水深以内的近岸带活动,且被油码头的引堤所阻挡。没有强烈扰动和掀带泥沙的浪和潮流,不会因潮流的最大底流速(0.25、0.32米/秒)的掀动而形成淤积,故不会产生严重的洄
I. Overview Qinhuangdao Port Coal Terminal Phase I project is China’s own design, manufacturing equipment and construction of the first installation of a modern carbon outlet. Located in the east of Xinkaihe, Qinhuangdao, west of the oil terminal, the pier is a stable coastal zone. There is not a lot of sediment on the seabed. Only a fine stream of sand flowing westward from the Shihe River is mainly in the coastal zone within a water depth of -4 meters and is blocked by the embankment of the oil terminal. Without strong disturbance and lifting of the waves and currents with sediment, it will not form siltation due to the tilting of the maximum bottom flow (0.25,0.32 m / s), so it will not produce serious migrations