论文部分内容阅读
川煤九处掘进一队于1983年3月在松藻矿区逢春矿井+670平峒创全岩独头月成巷进尺507.7米的好成绩,工程质量优良,掘进工效为2.07米~3/工,比预算定额提高165%,各种材料消耗均降低到计划定额以下,全月无安全事故,达到了优质、高产、安全、快速。该队1979年以来连续五年被评为煤炭部的等级队。1981年获“全国煤炭优秀等级掘进队”称号。1982年荣获“全国煤炭工业先进集体”称号。
In March 1983, a team of a group of coal dredging agents from Sichuan Coal Mine completed a good result of 507.7 meters in the entire rock formations of the entire rock formations at the Fengchun mine in Songzao mining area with an average entry of 507.7 meters. The engineering quality is good, and the tunneling efficiency is 2.07 m 3 / Workers, 165% more than the budget quota, all kinds of materials consumption are reduced to below the planned quota, no accidents throughout the month, reaching a high quality, high yield, safe and fast. For five years in a row since 1979, the team has been ranked as the coal rank team. In 1981 won the “national outstanding coal grade tunneling team” title. In 1982 won the “national advanced collective of coal industry” title.