论文部分内容阅读
本文把连续采煤机生产过程看成是生产和故障交替出现的更新过程,采用可靠性理论,提供了房柱式采煤法工作面生产能力的计算公式,方法简便,可为矿井和采区设计提供依椐。
In this paper, the production process of continuous shearer is regarded as the renewal process of alternate production and fault. By using the reliability theory, the formula for calculating the production capacity of the coal face mining method is provided. The method is simple and convenient and can be used for mine and mining area Design provided by 椐.