深圳铁路新客站位于深圳罗湖口岸,是深圳市九大基础设施工程之一,新客站工程占地面积26万平方米,建筑总面积9.3万平方米,工程分两期建设,一期工程6.6万平方米,由东主楼、跨线南楼、中楼、北楼一层及三个站台雨棚组成。由我局深圳工程处总包施工。在工期短、任务重、难度大的现实面前,在总结了我局北京亮马河大厦工程实施项目管理的经验基础上,创出了深圳速度,实现了创优质工程的目标。 一、优化管理层和作业层 指挥长、副指挥长和管理人员在全局范围内选聘,采取派遣方式组成工程指挥部。主体施工期间为30人,装修期间达到50人。这些人员除1人没有技术职称之外,期余均为中高级技术和管理人员。工人以原深圳工程处为主,组建成三个工程队,实行两班制施工作业。做到了精兵强将上前
Shenzhen Railway New Passenger Station is located at Shenzhen Luohu Port. It is one of the nine infrastructure projects in Shenzhen City. The new passenger station project covers an area of 260,000 square meters, and the total building area is 93,000 square meters. The construction of the project is divided into two phases. The first phase of the project is 66,000 yuan. The square meter consists of the main building, the South Tower, the middle floor, the first floor of the North Building, and the three platform canopies. By the Bureau of Shenzhen Engineering Agency general contractor construction. In the face of short-term, heavy-duty, and difficult reality, based on summarizing the experience of project management of the Beijing Liangmahe Building project of the Beijing Bureau, we created the Shenzhen speed and achieved the goal of creating a quality project. I. Optimization of Management and Operational Level Commanders, deputy commanders and management personnel are recruited on a global scale and dispatched to form an engineering headquarters. The construction period of the main body is 30 people and it reaches 50 people during the renovation period. Except for one person who does not have a technical title, the rest of the staff are middle and senior technical and managerial personnel. The workers were based mainly on the former Shenzhen Engineering Office and three teams were established to implement two-shift construction operations. Do a good job will go forward