1985年汛期黄河雨洪水沙的基本特点是:伏汛雨水偏枯、秋汛雨水偏丰、水量偏少、沙量偏枯、峰次较少、峰值不高。整个汛期花园口站来水量为265亿米~3,输沙量6.8亿吨,较常年分别偏少2.1%和35.1%,平均含沙量25.7公斤/米~3,大于3000米~3/秒以上洪水共有5次。以九月中旬洪峰流量8100米~3/秒为最大,这次洪水在下游演进过程中,大部滩区进水。汛期中水流量持续时间较长,秋汛洪水较大,三门 The basic characteristics of the flood and flood in the Yellow River during the flood season in 1985 are: partial flooding of flood and flood season, overcast autumn rainwater, less amount of water, less dry season, less peak and low peak. The flood season Huayuankou station has a water volume of 26.5 billion m 3 and a sediment discharge of 680 million tons, 2.1% and 35.1% less than normal levels respectively. The average sediment concentration is 25.7 kg / m 3 and more than 3000 m 3 / s The above flood a total of 5 times. In mid-September flood peak flow of 8100 m ~ 3 / sec for the maximum, the flood in the downstream evolution process, most of the beach area into the water. The duration of flood water in the flood season is longer, the flood flood is larger, three
其他文献
概要最近几年,运用地球物理层析成图法勘测平峒间或钻孔间岩体结构的研究,已取得了很大进展,解决了一些复杂的地质问题。本文就日本OYO公司和芬兰GEOSEISMO公司将地震、雷达
近年来,直销业以独特的优势和魅力在全球取得了令人瞩目的成绩。目前,全世界有125个国家和地区有直销公司在运营,据世界直销协会最近的一份统计表明,1995年全球直销总额达75
利用激光微区探针与感耦等离子体质谱结合即LAM_ICPMS技术 ,对已知TIMS年龄数据的若干单颗粒锆石进行了Pb/Pb及Pb/U年龄测定 .Pb同位素单质量分馏因子变化在 0 0 10~ 0 0 12
白山水电站位于第二松花江上游,1958年曾一度开工,1961年停工缓建,1972年正式开江筹建,1975年5月1日主体工程开工,1976年10月21日截流,截流之后,江水由两个9米宽的底孔过流
当前汉语教材适用性差,其原因就是国别性不够。教材的国别性也是针对性,是和通用性对应的概念,但二者并不矛盾。国别性主要包含教学对象国的内部因素与外部因素,其中内部因素
江西万安水电站,电工一次专业设计于1979年上半年完成技施设计第一阶段,尔后于1985年底完成技术设计工作。目前,本专业设计的重大原则问题均已定案。本文将扼要介绍本专业各
建国以来.我国兴建了各种类型的混凝土坝100余座,水闸近2.5万座,这些工程都发挥了防洪兴利的巨大效益,但由于设计考虑不周,施工质量不能保证以及在运行中管理不当等原因,工
水利电力部于1985年10月25日至30日在郑州主持审查了黄河小浪底工程的轮廓设计。这次设计是经国家计委批准,由黄河水利委员会和美国柏克德土木矿业公司合作组成联合设计组进
一、简介斯特朗蒂亚—斯普林斯混凝土拱坝是美国科罗拉多州丹佛的和奥罗拉西市新供水工程的一个组成部分。坝址基岩一般为优质花岗变质岩,只是在较低河符处坝下和拱坝支座上
洪水和山洪都是由大暴雨、特大暴雨形成的。但由于形成的地点、形成的先后不同,也就有了洪水与山洪的区分。在山区,山高谷深,沟壑纵横,特别是森林植被遭到破坏的地区,往往在