论文部分内容阅读
近几年来,随着气象科技服务领域的不断拓宽,科技人员开拓市场的能力不断增强。湖北省气象通信台自1996年来,先后承接了仙桃、天门、襄樊市所属的五县(市)国税局计算机网络综合布线工程。除了制定方案、签订合同外,采取何种办法保障施工质量,选择什么标准作为验收条件成为甲方(建设单位)与乙方(承建单位)所关注的焦点。作为甲方的建设单位,需要对承建单位的技术能力、施工水平有一个科学的认可,而作为乙方的承建单位使甲方信服的最科学的手段就是采取综合布线后的综合测试。这种综合测试手段所凭借的是先进的网络测试仪器,最终用测试报告取代验收报告,并以此证明乙方的技术实力和施工水平。
In recent years, with the continuous expansion of meteorological science and technology services, the ability of scientific and technological personnel to expand their markets has continued to increase. Since 1996, the Hubei Provincial Meteorological Communication Station successively took over the computer network integrated cabling project of Xiantao, Tianmen and Xiangfan City, the five county (city) taxation agencies. In addition to formulating plans and signing contracts, what measures are taken to ensure construction quality and what standards are selected as acceptance criteria have become the focus of attention of Party A (construction unit) and Party B (construction unit). As the construction unit of Party A, it is necessary to have a scientific approval for the technical ability and construction level of the construction unit. The most scientific means to convince Party A as the construction unit of Party B is to take comprehensive tests after comprehensive wiring. This comprehensive test method is based on advanced network test equipment. It eventually replaces the acceptance report with a test report, which proves the technical strength and construction level of Party B.