论文部分内容阅读
在水文地质、工程地质、水利和气象等系统中编制有关地下水矿化度等值线图、水位等值线图、水量、水压等值线图以及气压、气温和降水量等值线图等,常需要做等值线的插入工作。特别在野外测量时,如能立即在两个不同高程控制点间,按比例尺要求,合理地插入一定数量的等值线,从而即可在现场看出图上画的等值线是否反映了野外的实际情
In hydrology, engineering geology, water conservancy and meteorology, the system prepares contour maps of groundwater salinity, contour map of water level, contour map of water amount and pressure, contour map of air pressure, temperature and precipitation, etc. , Often need to do contour interpolation work. Especially in the field measurement, such as immediately between the two different elevation control points, according to the scale requirements, a reasonable number of insert the contour line, which can be seen in the field contour drawing on the map reflects the field The actual situation