论文部分内容阅读
今年三月初,南京水利水文自动化研究所(以下简称南京所)的同志前去云南鲁布革发电总厂对遥测系统进行汛前检修、维护工作,鲁布革遥测系统是南京所目前规模最大、投资最多的工程,也是我国西南的一个窗口工程。在中心站,修复了主机、显示器、打印机、电源避雷器、ups、空调及串、并接口板和控制板等。在十分困难的条件下,清除了计算机病毒,使中心站又恢复了正常的工作,同时还实现了一些以前未能实现的功能。在测站,安装了出库站,修复了普梯等测站,在中继站能工作的条件下,检查了小台湾、黑山等中继站,排除了一些同于天线、电台和控制板上的故障隐患。
In early March this year, comrades from Nanjing Institute of Hydraulic and Hydrological Automation (hereinafter referred to as Nanjing Institute) went to Yunnan Lubuge Power Plant to conduct pre-flood inspection and maintenance work on the telemetry system. The Rudige telemetry system is currently the largest in Nanjing, The project with the most investment is also a window project in southwest China. In the central station, repaired the host, monitors, printers, power surge arresters, ups, air conditioners and strings, and interface boards and control panels. Under very difficult conditions, the computer virus was cleared away, the central station was restored to normal work, and at the same time, some functions previously not realized were realized. At the station, a station was installed, stations such as Puti were repaired, and relay stations such as Little Taiwan and Montenegro were checked under the conditions that the relay station was able to work. Exclusion of some hidden faults on antennas, radio stations and control panels .