The main railway tunnel hosts two 107m long junction caverns within the area of the Imperia Station.The first is located at a distance of 100m from the Imperia
The West Kowloon flood relieving project comprising a drainage tunnel of 4.9m finished diameter,3.7km long,and a water transfer tunnel of 3.0m diameter,2.8km lo
T(o)sustain development of our first new town,Tsuen Wan,drainage improvement works were carried out in Tsuen Wan and its adjacent district Kwai Chung in order t