水电十四局承建的广州抽水蓄能电站,地下工程规模宏大,其结构也非常复杂。其中,高水头、大直径高压钢筋混凝土斜井工程的施工,又是整个电站在1992年能否发电的关键之一。施工用的斜井模板由于难度大、要求高,在围内水电工程施工至今未获解决。为此,水电十四局广东分局组成了攻关小组,在总结平洞针梁模板的基础上,经一年多的潜心研究,并经多次讨论、修改和优化,研制了XDM-8.5型斜井滑模,为水电工程施工模板增添了新品。
The Guangzhou Pumped Storage Power Station contracted by Fourteen Bureau of Hydropower has a huge underground project and its structure is very complicated. Among them, the construction of high-head and large-diameter high-pressure reinforced concrete inclined shaft project is also one of the keys to whether the entire power station can generate electricity in 1992. Inclined well construction of the template due to the difficulty, demanding, in the Wai hydropower construction has not been resolved. To this end, hydropower fourteen Bureau of Guangdong Branch formed a research team, in the summary of flat-hole needle beam template, after more than a year of painstaking research, and after many discussions, modifications and optimization, developed XDM-8.5 type oblique Well sliding mode, for hydropower construction template added new products.