碧口水电站土石坝施工中的一些经验与教训

来源 :水利水电技术 | 被引量 : 0次 | 上传用户:jiangyanxiaonvzi
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、概述碧口水电站位于甘肃省文县碧口镇,是开发嘉陵江支流白龙江的一项以发电为主的综合利用的水电工程。拦河大坝为壤土心墙土石坝,最大填筑坝高101m,坝顶长297.4m,坝顶宽8m,坝顶上设有5.3m高的防浪墙。总填筑方量396.6万m~3,坝下设有两道截断河床砂砾石冲积层的混凝土防渗墙,在冲积层中的宽防渗墙深42.5m、宽1.3m;在心墙下部与冲 I. Introduction Bikou Hydropower Station is located in Bikou Town, Wenxian County, Gansu Province. It is a hydropower project that takes the power generation as the main project and develops the Bailongjiang River, a tributary of the Jialing River. The dam is a loam core earth-rockfill dam with a maximum filling height of 101m, a crest length of 297.4m and a crest width of 8m. There is a 5.3m high wave-proof wall at the crest of the dam. With a total filling volume of 396.6 million m 3. There are two concrete cutoff walls cut off riverbed sand and gravel alluvium below the dam. The wide cutoff wall in the alluvium is 42.5 m deep and 1.3 m wide. Rush
其他文献
曹露玉原在电脑公司上班,当有一位客户说能向她提供修复残旧损伤的电脑光盘及 VCD 光盘的技术时,她毅然辞去了月薪1000元的工作,开始了修复光盘的生意。修复光盘是个新行当,
本文探讨浇筑间隔对碾压混凝土层面结合的影响.提出了有关室内试验的试验结果;在分析试验结果的基础上,提出“以下层混凝土中胶凝材料的初凝时间为分界点,将层面结构分为两种
我校地处城乡接合地带,大部分学生都来自农村,学生英语基础薄弱,学习习惯比较被动。在农村学校,怎样才能提高英语教学效果呢?笔者在教学中进行了一些有效的尝试。一、要有弹
对于黄河中游来水来沙问题我是第一次接触,情况了解不够,许多研究成果尚有待消化,很难提出什么好的建议,仅谈谈个人的一点看法。 前一段时间有人提出长江来沙量增加问题,当
建国初期,戏曲艺术工作者们响应号召,在各方面对戏曲艺术进行保护和推进发展的工作,创作出一批优秀的戏曲剧目。这些剧目中的唱腔都是前辈音乐艺术家们在本剧种的传统音乐基
碧口水电厂是西北电网的骨干电厂之一,自76年投产以来,三台机组振动大的问题一直未能得到解决,水轮机叶片不断产生裂纹,机组明显存在着两个振动区,从而影响机组在系统中的调
Based on careful sampling and accurate analysis of recent sediments in Lake Chenghai, this paper discusses the staggered positive/negative correlation between o
电视剧《男人四十要出嫁》讲述的是一个农民工小木匠周六福的传奇励志故事。该剧用“真、善、美”带给了观众真正的感动,从而激发了观众对电视剧叙事的认同。本文主要想谈的
2014年10月30—31日,由北京电影学院研究生院主办的首届“全国电影学青年学者论坛”在我校举行。来自北大、清华、南开、复旦、中国传媒大学、中国艺术研究院、北京电影学院
压力管道的流速、水头损失、造价和运行、施工、维修等费用都取决于管道直径。由于引水径流式电站中,其河流流量频率曲线往往较陡,而电站本身又无调节能力,按天然流量发电。