论文部分内容阅读
针对国华准格尔3期扩建工程中吸收塔在安装工程中使用倒装法进行了描述,并与正装法施工进行了简要的对比.
In the third phase of Guohua Zhungeer expansion project in the installation of absorption tower using flip method was described and compared with the formal method of construction were briefly compared.