四川省绵阳市城区涪江防洪堤工程,河滩采砂现象严重,形成较厚的软土地基,且修建工期较短。文章通过对软土地基处理方案的比较研究,选择了放缓堤坡+土工合成材料的技术处理方案对软土地基进行处理,较好地解决了在较短工期下软土地基城市防洪堤的修建难题,在类似地质条件、修建工期较短的城市防洪堤可供借鉴。该防洪堤经过近6 a的运行,情况良好。
Mianyang City, Sichuan Province, Fujiang River flood control dam works, sand beach serious sand phenomenon, the formation of thick soft soil foundation, and the construction period is shorter. Through the comparative research on the soft soil foundation treatment scheme, the article chooses the technical treatment scheme of slowing down the slope + geosynthetics to treat the soft soil foundation and solves the problem of the flood control dike Building difficult problems, similar to the geological conditions, the construction of a shorter period of urban flood levees for reference. After nearly 6 years of operation, the flood control embankment was in good condition.