贵州省人大办公楼第三至六层和第八层两侧部分均为毛面顶棚涂料喷涂,喷涂面积为4982米~2,楼梯底面及天沟底面喷涂面积为2612米~2,毛面顶棚涂料喷涂面积共计7594米~2,其中4982米~2为预制空心板,2612米~2为现浇混凝土板。一、施工准备1.机具(1)2V—0.6/7-B型空气压缩机1台,排气量每分钟为0.6米~3,额定压力0.7兆帕,外形尺寸为1.39米×0.5米×1米,为一级、风冷移动式,功率4.5千瓦,转速
The third to sixth floors of the office building of the Guizhou Provincial People’s Congress and the eighth floor of the office building are painted with frosted ceiling paint. The spraying area is 4982 meters~2. The bottom surface of the stairs and the bottom surface of the gutter are sprayed with an area of 2612 meters~2. The total area of paint sprayed is 7594 meters~2, of which 4982 meters~2 are prefabricated hollow slabs, and 2612 meters~2 are cast-in-place concrete slabs. I. Construction Preparation 1. Machine (1) Air compressor of type 2V-0.6/7-B, with a displacement of 0.6m-3 per minute, a rated pressure of 0.7MPa, and an overall size of 1.39m × 0.5m × 1 meter, one level, air-cooled mobile type, power 4.5 kW, speed