论文部分内容阅读
黄河龙羊峡至青铜峡河段,地处青藏高原东北部和黄土高原西部,其中龙羊峡至兰州河段,流经祁连山系东南支脉日月山和拉脊山,以及秦岭山脉西部的扎马山、雾宿山和皋兰山。山脉海拔高度2,800~4,800m,属青藏高原及其东部强烈上升的中高山区,区内山势高耸,悬崖深谷,河水湍急,龙羊峡、李家峡、公伯峡、积石峡、寺沟峡、刘家峡、盐锅峡和八 The Yellow River from Longyangxia to Qingtongxia, located in the northeastern Qinghai-Xizang Plateau and the western Loess Plateau, where the Longyangxia to Lanzhou, flows through the Qilian Mountains southeast Rim and Lajishan, as well as the western Qinling Mountains Zama Mountain, fog Su Hill and Gaolan Mountains. The mountain ranges at an altitude of 2,800 ~ 4,800m. It belongs to the mid-high mountain area where the Qinghai-Tibet Plateau and its eastern part rise strongly. The mountainous areas are towering in mountainous areas, cliffs, river rapids, Longyangxia, Lijiaxia, Gongboxia, Jishifaxia, Liujiaxia, salt pot Gap and eight
其他文献
本文回顾了以往薄拱坝泄洪布置形式,阐述了提高坝身泄洪能力的途径,并引用模型试验测得的坝下冲刷区河床上动水压力和冲刷变化资料,分析了冲击消能的基本原理和消能效果,从而
1987年12月15日8时53分位于湖北省清江上的隔河岩水电站截流成功。隔河岩水电站是在清江上修建的第一个大型水电工程,电站装机容量120万kW,最大坝高151m,总库容34亿m~3,控制
龙羊峡水电站位于青海省共和县,其单机容量是目前我国最大的,也是国内海拔最高(2448米)的大型水电站之一。电站最高水头150米;设计水头122米;最小水头99.5米;发电极限最低水
一、引言赣江,是江西省第一大河流,也是长江的重要支流之一,总水量仅次于岷江、湘江、沅江而居第四位。其干流纵贯江西南北,水量丰沛。赣江流域面积83500平方公里,占全省总
从某些研究层面来说,语言认知就是对于语言使用过程中出现的一些心理特征等方面的策略研究,其中的心理特表征则包括了一些对于外部环境信息的接受以及出现的各种反应和形式等
水电站输水隧洞方案的经济性,不仅要考虑该方案的投资,同时也要考虑水流在隧洞中所损失的容量与能量的价值。输水隧洞的动能经济计算,国内沿袭苏联的经验,常用抵偿年限法或
Nitrogen doped fluorinated amorphous carbon thin films(a-C:N:F)were prepared by radio frequency plasma enhanced chemical vapor deposition(rf-PECVD)under differe
美国国际地球物理公司(Geophysics International公司,简称GI公司)于1975年开始研制岩性探测仪[Petro-Sonde(商品名)]1983年问世。岩性探测仪是一种被动式地球物理仪器,适用
近年来世界各国地下洞室工程建设日益繁多,水电建设中也常会遇到地下洞室工程,诸如引水隧洞,调压井,地下厂房以及泄洪,导流隧洞等水工建筑物.目前地下洞室的开挖跨度长达30米
本文根据锥形导水机构关闭时,各导叶密合面之间的相互关系建立起三维空间的数学模型,由基本参数用解析法求解出导叶在各平截面上头部或尾部的密合角及密合点,同时根据导叶偏