论文部分内容阅读
永宁黄河公路大桥线路全长3.753公里,大桥主桥采用110米+260米+110米双塔双索面斜拉桥,副桥为变截面连续箱梁,引桥采用50米预制T梁,大桥主塔高102.15米,创造了宁夏桥梁史新高,项目总投资15.74亿元。永宁黄河公路大桥是宁夏境内首条以BOT模式投资建设的公路大桥,亦是宁夏及黄河上游段第一座跨越黄河的双塔双索面斜拉桥。大桥采用双向六车道,设计荷载等级为公路一级,设计速度80千米/小时。收费站设八进八出16条通道,并设有绿色通道、ETC卡快速不停车收费通道,配有手机支付等付费方式,24小时最大可通过三万余车次,大桥收费
Yongning Yellow River Highway Bridge line length of 3.753 kilometers, the bridge main bridge with 110 meters +260 meters +110 meters double towers double cable plane cable-stayed bridge, Vice-section continuous box girder variable cross-section, using 50 meters prefabricated T-beam bridge, the main bridge Tower 102.15 meters high, creating a record high bridge in Ningxia, a total investment of 1.574 billion yuan. Yongning Yellow River Highway Bridge in Ningxia is the first to invest in the BOT model highway bridge construction, Ningxia and the Yellow River upstream section is the first across the Yellow River double-tower double-cable-stayed bridge. Bridge using two-way six lanes, the design load level for the highway level, the design speed of 80 km / h. Toll station eight eight eight out of 16 channels, and has a green channel, ETC card fast non-stop toll access, with a mobile payment and other payment methods, 24 hours up to more than 30,000 trips, the bridge charges