论文部分内容阅读
本文介绍了薄板坯连铸一连轧技术中的CSP工艺自1989年在纽柯建成第一条生产线后,近几年来在工艺技术、装备及其控制系统等方面的发展改进。
This paper introduces the development of CSP technology in thin slab continuous casting and continuous rolling technology. After the first production line was built in Neuch in 1989, the development and improvement of technology, equipment and control system in recent years have been introduced.