一、问题及处理永济一闸(重建)工程,设计为井柱式框架结构。井柱为钢筋混凝土,两排共14根。孔径1米,前孔深20米,后孔深16米。地基为粉、细砂地层。井孔采用普通粘土泥浆固壁、冲击钻造孔、抽筒出渣的施工方法。造孔完成后,发生大量粉、细砂回堆,两小时16米孔深回堆2米。而井架移位及施工准备需5—7小时,因而影响钢筋网吊放和混凝土浇筑。
I. Problems and Solutions Yongji No. 1 (reconstruction) project is designed as a well-column frame structure. Well column for reinforced concrete, a total of two rows of 14. Aperture 1 meter, 20 meters deep before the hole, 16 meters deep after the hole. Foundation for the powder, fine sand formation. Borehole ordinary clay slurry wall, the impact of drilling holes, pumping tube slag construction methods. After the completion of the hole, a large number of powder, fine sand back to the heap, two hours 16 meters deep hole back to 2 meters. The derrick displacement and construction preparation need 5-7 hours, thus affecting the steel mesh hanging and concrete pouring.