岩滩电站坝高100m、混凝土方量达300万 m~3,全站装机容量4×30.25万 kW,要求1992年7月第一台机组并网发电,工作量大、任务重。作为混凝土进仓主要运载工具的2号无塔架缆机组(简称低缆)起升机构的测速发电机在1989年初多次发生故障,被迫停工。我局第五工程处的技术人员将4m~3电铲电压反馈的原理应用到缆机上,用它代替测速发电机,实践证明是成功的,确保了混凝土的正常施工,1989年10月浇筑了11.06万 m~3,创全国先进水平。
Yantan dam height of 100m, concrete side volume of 3000000 m ~ 3, the total installed capacity of 4 × 302500 kW, in July 1992 the first unit and the grid, heavy workload, heavy tasks. As the main carrier of concrete warehousing No tower 2 cable tower (cable) lifting mechanism of the tachometer generator in 1989, repeatedly failed, was forced to work. The technical staff of the Fifth Engineering Department of our bureau applied the principle of 4m ~ 3 electric shovel voltage feedback to the cable machine, replacing the tachogenerator with it, and proved to be successful in practice, ensuring the normal construction of the concrete and pouring in October 1989 110,600 m ~ 3, a national advanced level.