论文部分内容阅读
小水电项目受政策、自然、投资与运行等因素影响,存在着诸多不确定性。2007年以来,农发行浙江省衢州市分行支持的常山芳村、柯城航埠两个小水电建设项目,贷款3600万元,都在一定程度上出现了建设期内超工期或超预算、经营期内效益低于预期水平、到期贷款难以归还等问题。本文结合该行支持小水电项目的实践以及两家电站的实际运营情况,分析小水电项目风险的成因,并就完善小水电信贷管理工作提出对策。
Small hydropower projects affected by the policy, nature, investment and operation and other factors, there are many uncertainties. Since 2007, the two small hydropower construction projects of Changshan Fangcun and Kechenghang Port supported by the Agricultural Development Bank of China’s Quzhou Branch of Zhejiang Province have borrowed 36 million yuan, all of which, to some extent, have exceeded the construction period or exceed the budget and the operating period Less than expected internal benefits, due loans difficult to return and other issues. This paper analyzes the causes of SHP risks in line with the practice of the SHP and the actual operation of the two power plants, and puts forward some countermeasures to improve the SCM credit management.