论文部分内容阅读
分析了铁路局投资工程建设造价控制中存在的一些普遍性问题及形成原因,提出了加强设计阶段和招标阶段投资控制,以施工签证为决算审核重点等造价控制措施,以期节约工程建设资金。
This paper analyzes some common problems existing in the construction cost control of investment by Railway Administration and the reasons for their formation. It puts forward some cost control measures such as strengthening the control of investment during the design phase and the bidding phase, and focusing on the construction visa as the final accounts so as to save construction funds.