引黄济青工程系自多泥沙河流引水,跨流域、远距离的大型调水工程。该工程横跨山东省惠民、东营、潍坊和青岛4个地(市),10个县(市、区),自黄河下游打渔张引黄闸进水口起,到青岛市白沙水厂止,全长约290km。整个工程于1986年4月动工,1989年11月按期向青岛市供水。截止到1992年2月17日,已经历三个年度的五期运行。三年来,累计从黄河引水7.97亿m~3,向沿途提供灌溉用水3.97亿m~3,补给沿线两岸地下水1.7亿m~3,送入青岛市棘
Yin Huang Jiqing Engineering Department from multi-sediment diversion, inter-basin, long-distance large-scale water diversion project. The project stretches across 4 ports (cities), 10 counties (cities and districts) of Huimin, Dongying, Weifang and Qingdao in Shandong Province, starting from the inlet of Zhangyan Yellow River in the lower reaches of the Yellow River to Baisha Water Plant in Qingdao , A total length of about 290km. The whole project started in April 1986 and provided water to Qingdao on schedule in November 1989. As of February 17, 1992, it has gone through five phases of three years of operation. In the past three years, a total of 797 million m 3 of water was dredged from the Yellow River to provide irrigation water of 397 million m 3 along the route, replenishing 170 million m 3 of groundwater along both sides of the Yellow River,