光爆和锚喷在托海电站导流排沙隧洞施工中的应用

来源 :水力发电 | 被引量 : 0次 | 上传用户:sdwtb
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
托海水电站位于新疆伊犁哈萨克自治州马扎尔峡谷出口处,是喀什河流域规划的17个梯级电站中的最后一级,总装机容量5万kW。水利电力部第五工程局二分局托海工程队承包该电站导流排沙隧洞的洞挖和顶拱、边墙支护工程后,经过6个月的施工,提前4个月圆满完成了预定任务,实现了优质、高速、安全、低耗施工。 Tuohai Hydropower Station is located at the exit of Mazar Canyon in Ili Kazakh Autonomous Prefecture, Xinjiang. It is the last of the 17 cascades planned by the Kashi River Basin with a total installed capacity of 50,000 kW. Ministry of Water Conservancy and Electric Power Bureau of the Fifth Engineering Branch of the two teams entrusted with the project contracting unit of the drainage tunnel drainage tunnel and roof arch, side wall support project, after 6 months of construction, 4 months in advance of the successful completion of the scheduled Mission, to achieve high-quality, high-speed, safe, low-cost construction.
其他文献
硅压阻测速探头采用微型探针结构,以硅压阻器件作为压力敏感元件制成测速探头。它的尺寸小,具有良好的静、动态特性,可测量水流平均流速和脉动流速。在低雷诺数的水流中,还
提出了一种基于大芯径塑料包层光纤的嵌入式微结构光纤器件,该结构的锥区末端具有均匀的折射率分布与光场分布。理论分析结果表明,耦合系数随着锥区直径的减小呈现指数形式增
1.引言《少数族群语言与多语教育——连结本土与世界的桥梁》是Springer出版社教育语言学系列论文集的第18卷,这一系列文集旨在对世界范围内的教育改革和创新活动进行深入探
一、现场应用的情况1984年和1986年春和1985年冬,笔者曾在贵定五道河水库小普干渠和黔西附廓水库左干渠上进行现场试验,前者试验段长206米,后者为930米。(一)贵定五道河水库
随着国内外水电建设的大规模发展,不断涌现出大量新技术。实践证明,其中相当一部分在满足工程安全、运行可靠要求的同时,可较老的技术节约大量人力、物力、财力,并能加快工
文章提出具有水电调节计算的电力系统电源发展规划的水电调节优化方法.适用于具有大量水电的电力系统电源发展规划的计算.方法的理论基础是数学上的分解——协调理论.数值算
大坝的合理化施工,对降低工程造价、缩短工期,改善施工管理等,都有明显的经济效益,是值得重视的研究课题。日本建设省10年以前就致力于这方面的工作,并在玉川坝和浅濑石川坝
杰巴坝位于尼日利亚的尼日利河上,其主坝是一座分区式土石坝。坝顶高程108m,最大坝高42m,坝基为深厚冲积层,最大厚度达70m(图1)。 The Djiba dam is located on the Niger
一、问题的提出及研究途径对于大中型水利枢纽主体工程施工期间有通航要求的明渠导流方案,整个导流系统可以看作是由导流明渠、明渠进出口与天然河道衔接的引航段、及上下游
通过对青藏高原东部若尔盖盆地兴措湖 5 0年来Gyraulussibirica壳体元素及同位素分析 ,并与器测气象资料的比较 ,建立了兴措湖记录与对应的降水和气温间的函数关系 ,探讨了湖