根据本队封孔验证情况作些剖析,并论述提高水泥封孔质量的几个问题。一、水泥封孔质量情况与剖析我队先后在多个矿区、多种矿种中进行了封孔验证。发现在同一矿区、同一矿种,使用同一类水泥标号,由于操作人员不同,水泥封孔的质量也不同。根据验证的结果,归纳起来有五种情况:1.取出水泥芯(石)的位置与原封孔设计孔段相符,且取出的水泥芯硬而完整;2.水泥封填的长度(厚度)比原封孔设计孔段少(薄);3.水泥封填的位置虽与原封孔设计孔段相符,但水泥石松散(软),为粒状、块状;4.封孔的孔段与原封孔设计孔段不符,提高了或降低了;5.在封填水泥孔段钻具下降时,根本未遇到水泥。剖析以上五种情况是:
According to the verification of the sealing of the team, some analyses were made and several issues were raised to improve the quality of cement sealing. First, the quality of cement sealing and analysis of our team has in a number of mining areas, a variety of minerals in the sealing verification. It was found that in the same mining area and the same mineral type, the same type of cement label was used, and the quality of the cement sealing hole was different due to different operators. According to the results of the verification, there are five situations: 1. The position of the cement core (stone) removed is in accordance with the original hole design hole section, and the cement core taken out is hard and complete; The cement sealing length (thickness) is less (thin) than the original hole design hole section; Although the position of the cement seal is consistent with the design of the original hole design, the cement stone is loose (soft), granular and massive. Sealed hole segment does not match with the original hole design hole segment, increased or decreased; 5. When the cement drilled in the hole section of the cement was lowered, no cement was encountered at all. An analysis of the above five situations is: