论文部分内容阅读
文章结合福清市闽江调水工程五马山隧洞施工支洞塌方处理施工,介绍了采取措施强行通过塌方体的施工处理措施,并取得了预期效果。
Combined with construction of Wumanshan tunnel construction branch cave in Minjiang water transfer project of Fuqing City, this paper introduces the measures of construction measures for forcibly passing the landslide body, and achieves the expected results.