刘家峡坝基实测扬压力的特点及原因分析

来源 :人民黄河 | 被引量 : 0次 | 上传用户:guyueer83
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
刘家峡水电站主坝Ⅶ坝段幕前实测扬压力系数长期大于设计值,引起有关方面对坝前泥沙淤积层的防渗作用问题的关注。本文结合工程地质及帷幕施工等情况,对坝基扬压力的长期实测资料进行分析,表明泥沙淤积层的防渗作用是肯定的,但其具体效果受到基岩渗透性能和帷幕质量的影响。 The measured typhoon coefficient in front of the main dam section Ⅶ of Liujiaxia Hydropower Station was longer than the designed value for a long time, which aroused the concern of the parties concerned on the seepage control effect of the sediment layer before the dam. Based on the engineering geology and the construction of the curtain, the long-term measured data of the dam foundation uplift pressure are analyzed. The results show that the anti-seepage effect of the sediment layer is affirmative, but the concrete effect is affected by the permeability of the bedrock and the curtain quality.
其他文献
一、引言 由于地形、地质及枢纽布置上的限制和要求,我国许多大中型水电站常常采用地下式厂房,这就不可避免长尾水洞的布置形式。为了减小水击压力和满足机组调节保证计算的
借助于一系列的光弹组合模型试验和有限元计算,本文在地基弹性模量变化较大的范围内(特别是软弱基岩情况)究研了重力坝坝体的应力情况;并将这些成果与各种理论解答作了比较。
一、引言如所周知,沿明渠湿周的边界切应力分布与明渠横断面形式、付流涡的结构以及边界粗糙度的任何可能的不均匀性等因素有关。从许多与阻力、泥沙、扩散或气蚀等问题有关
“课题实验课”是指在日常课堂教学中融入相关课题研究所需要的有效课堂观察的实践研究课。它是课题研究过程中的一个单元或片断,将这样若干个单元或片段循序渐进地连接在一
目前,用计算机编制网络计划和绘制网络图仍需不少人工参与。本文初步探讨了自动形成网络、自动定位网络节点和绘制网络图的计算机方法,并以实例说明,提高了编制网络的自动化
美国预拌混凝土公司采用了一种崭新的混凝土搅拌车。该车的出料口在车身的前面,可通过液压装置调整车身长度和出料口高度。由于混凝土的装载量大、工效高、降低了人工成本,
我国水力资源十分丰富,但多数水电站处于深山峡谷之中,厂房及开关站的布置十分困难.为了减少大量的开挖和投资,有的水电站厂房和主变压器只得布置在地下和混凝土大坝内,如渔
建国以来,我国有关部门曾多次研究了从长江调水解决西北华北水资源不足的方案。其中最主要的有三条:即从长江下游调水的东线方案(长江—大运河—黄河—海河);从长江中游调水
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
连政发[2015]107号各县、区人民政府,市各委办局,市各有关单位:为深入贯彻党的十八大、十八届三中、四中全会精神和习近平总书记、李克强总理关于职业教育工作重要指示精神,