高压充油电缆运行情况及存在问题分析

来源 :水电站机电技术 | 被引量 : 0次 | 上传用户:haidiaiqing
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
我国水力资源十分丰富,但多数水电站处于深山峡谷之中,厂房及开关站的布置十分困难.为了减少大量的开挖和投资,有的水电站厂房和主变压器只得布置在地下和混凝土大坝内,如渔子溪、乌江渡水电站.有的水电站厂房、主变压器及开关站均布置在地下或混凝土坝内,如刘家峡、凤滩水电站.由于受岩层地质或受坝体结构的应力的控制,不可能在地下或坝内开设大面积的裸 China’s hydropower resources are very rich, but most of the hydropower stations are in the mountains and valleys, plant and switchgear layout is very difficult.In order to reduce the large amount of excavation and investment, some hydropower plant and main transformer had to be arranged in the underground and concrete dams, Such as Yuzi River and Wujiangdu Hydropower Station.Many hydropower station buildings, main transformers and switchgear are all arranged in underground or concrete dams, such as Liujiaxia and Fengtan Hydropower Stations.Because of the strata geology or the stress of the dam structure, It is possible to open a large area of ​​nakedness underground or in a dam
其他文献
借助于一系列的光弹组合模型试验和有限元计算,本文在地基弹性模量变化较大的范围内(特别是软弱基岩情况)究研了重力坝坝体的应力情况;并将这些成果与各种理论解答作了比较。