论文部分内容阅读
3月27日,珠委总工程师李景堂主持召开委前期工作会议,传达贯彻水利部前期工作会议精神,总结我委1997年前期工作完成情况,研究部署1998~2000年水利前期工作。委主任薛建枫、副主任邓德云到会并作了讲话。委属二级单位和委机关有关处室领导及有关业务负责人参加了会议。会议认为,几年来在委的重视和各部门、各单位的共同努力下,我委1997年的前期工作基本上按计划完成了任务。会议提出,珠委1998~2000年的前期工作,要根据《防洪法》和《水利产业政策》,按照水利部对水利前期工作的发展要求,结合珠江水利建设
On March 27, Li Jingtang, Chief Engineer of Zhuhai Committee presided over the pre-committee working meeting, communicated and implemented the spirit of the previous work meeting of the Ministry of Water Resources, concluded the completion of the work of the previous period of 1997 of our committee, and studied and deployed the preliminary work of water conservancy from 1998 to 2000. Xue Jianfeng, director of the commission, and Deng Deyun, deputy director, addressed the meeting and made speeches. The subordinate second-level units and the leaders of relevant departments of the organs and the heads of relevant departments attended the meeting. The meeting held that over the past few years, with the joint efforts of various departments and departments, the preliminary work of our committee in 1997 basically completed its tasks as scheduled. The meeting suggested that the preliminary work of the Pearl Committee from 1998 to 2000 should be based on the “Flood Prevention Law” and “Water Industry Policy” and in accordance with the requirements of the Ministry of Water Resources for the development of the preliminary work of water conservancy and the construction of the Pearl River Water Conservancy