2013年11月15日,乌江彭水水电站工程调整概算报告通过水电水利规划设计部院会同重庆市发展改革委审查。乌江彭水水电站位于彭水县城上游11 km处。坝址距乌江河口涪陵市约147 km,至重庆距离约170 km。电站主要枢纽建筑物由碾压混凝土重力坝、右岸地下厂房和左岸通航设施等组成。电站装机容量1750 MW。2008年12月5台机组全部投产,2010年12月通航设施通过验收。会议听取了长江设计公司关于调整概算报告主要内容的汇报,与会专家和代表依据国家有关政策和行业规定,
November 15, 2013, Wujiang Pengshui hydropower station adjustment project budget report through the hydropower planning and design of the hospital with the Chongqing Municipal Development and Reform Commission review. Wujiang Pengshui Hydropower Station is located 11 km upstream of Pengshui County. The dam site is about 147 km away from Fuling City on the Wujiang River estuary and about 170 km to Chongqing. The main hub of the power plant consists of RCC gravity dam, right bank underground powerhouse and navigation facilities on the left bank. Power station installed capacity of 1750 MW. December 2008 5 units put into operation, in December 2010 navigation facilities through the acceptance. The meeting listened to the report of the Yangtze River Design Company on the adjustment of the main contents of the budget estimates, participating experts and representatives in accordance with relevant state policies and industry regulations,