论文部分内容阅读
氰化炭浸工艺首次在蒙古国岩金矿山应用。在Bumbat选矿厂技术改造设计中,采用了低压无氰解吸同温电解;尾矿压滤后存放于防渗的尾矿库中;含氰贫液循环使用;解吸电解金泥精炼。3个月的生产实践表明改造后的工艺流程先进,技术指标达到了世界上同类矿山的先进水平。
Cyanide carbon impregnation process for the first time in Mongolia gold rock gold mine application. In the technical transformation design of Bumbat concentrator, the low-pressure non-cyanide desorption isothermal electrolysis is adopted; the tailings are pressure-filtered and stored in the seepage-proof tailings reservoir; the cyanide lean solution is recycled; the desorption electrolytic gold sludge is refined. 3 months of production practice shows that after the transformation of the advanced process technology, technical indicators have reached the advanced level of similar mines in the world.