近年来,新疆加大了沼气集中供气工程建设的力度,大中型沼气工程、养殖小区沼气工程和联户沼气工程数量大幅增加。但是,沼气集中供气工程管理人员普遍缺乏沼气工程安全越冬常识,从而影响了工程冬季正常运转和效益发挥。为了更好地解决沼气工程冬季正常运行难题,本文将沼气集中供气工程越冬常见故障及排除措施介绍如下:1进料泵开不动排除方法(1)检查电源电压是否正常,电源至电机前电
In recent years, Xinjiang has stepped up the construction of biogas centralized gas supply projects. The number of large and medium-sized biogas projects, breeding biogas projects and biogas projects have increased substantially. However, biogas centralized gas supply project management staff generally lacks common sense of biogas safety over winter, thus affecting the normal operation of the project in winter and benefits. In order to better solve the problem of normal operation of biogas project in winter, this paper introduces the following common faults and precautions of over-wintering of biogas centralized supply project as follows: (1) Check whether the power supply voltage is normal or not, Electricity