论文部分内容阅读
根据国内外目前有关水轮机转轮几何形状及尺寸验收标准,并结合国内水电站水轮机质量问题和近几年对一些大中型水电站水轮机转轮几何形状及尺寸的检测验收中出现的问题,强调了转轮在出厂前进行检测验收的重要性,并提出了改进检测方式的意见,期望本文能对有关标准的制订与修改,以及用户在水轮机招标合同中相关技术条款的制订提供参考.
According to the current domestic and international standards for turbine geometry and size acceptance, combined with the problems of turbine quality in domestic hydropower stations and the inspection and acceptance of the geometry and size of turbine runners in some large and medium-sized hydropower stations in recent years, The importance of testing and acceptance before leaving the factory and the suggestion of improving the testing method are put forward. It is expected that this article can provide references for the formulation and revision of relevant standards and the formulation of relevant technical clauses in the bidding contract of the turbine.