针对连杆进行冲压工艺分析,通过比较两套级进模排样方案,最终设计了双侧载体、双侧导正钉导正的排样方案。排样依次安排冲裁、弯曲、空工位、切断等10个冲压工序,材料利用率达到43.3%。考虑到模具精度、模具强度、加工方法等因素,对工作零件和辅助零件等部件的模具结构进行设计。针对小直径冲裁凸模容易磨损、需更换的特点,设计了快换式凸模,且凸模工作部分添加保护套,异形冲裁凸模采用挂台定位。凹模采用镶块结构,由台肩式或过盈配合方式固定。向下弯曲模具预留避让槽,向上弯曲凸模安装在卸料板上,保证弯曲顺利进行。设计了由矩形截面弹簧、弹性管、螺杆和螺塞组成的弹性卸料装置,节省弹簧运行空间。本文设计的连杆级进模设计方案能够满足工业生产要求。
According to the analysis of the stamping process of the connecting rod, by comparing the two sets of progressive die arrangement program, the two-sided carrier and the double-side guide nail guide layout program is finally designed. Arranged in order to punching blanking, bending, empty station, cut off 10 stamping processes, material utilization rate reached 43.3%. Taking into account the mold accuracy, mold strength, processing methods and other factors, the working parts and auxiliary parts and other components of the mold structure design. For the small diameter punching punch is easy to wear, the need to replace the characteristics of the design of the quick change punch, and the punch part of the work to add protective sleeve, shaped punching punch hanging position using positioning. Die with embedded structure, by the shoulder or interference with the fixed way. Bending down the mold aside to avoid the groove, the upward bending punch installed in the discharge plate, to ensure smooth bending. The elastic unloading device composed of rectangular section spring, elastic tube, screw rod and screw plug is designed to save space for spring operation. In this paper, the connecting rod progressive die design program to meet the industrial production requirements.