论文部分内容阅读
鹿土石铺水电站是霍山县第一座水电站,位于县城西南35华里的小山沟里,设计流量为0.5秒公方,水头为2.5公尺,水轮机出力约12匹马力,电站下游还有一个旧式水力加工站,安装有5台旧式水轮机,约计15匹马力。电站和水力站建成以后,当时由于缺乏加工机械,影响生产,我们就发动和依靠群众,鼓励大胆革新创造,采取帮助研究,多表扬少批评,制定奖励制度,建立技术领导小组,开展技术革新运动。在技术上和材料供应上遇到困难时,就开诸葛亮会议,集体研究
Lu Tu Shibu hydropower station is the first hydropower station in Huoshan County, located in the town 35 kilometers southwest of the small valley in the design flow of 0.5 seconds of the public square, the head of 2.5 meters, the turbine output of about 12 horsepower downstream of the station there is an old hydraulic Processing station, installed five old turbine, about 15 horsepower. After the completion of power stations and hydropower stations, due to the lack of processing machinery, production was affected at that time, we mobilized and relied on the masses to encourage bold innovations and innovations, to help research, to praise more and criticize less, to establish incentive systems, to establish technology leadership groups and to carry out technological innovation campaigns . In the technical and material supply difficulties encountered when it opened the Ge Liang meeting, the collective study