由水电部水利水电规划设计院和农田水利司联合组织编制的《泵站技术规范,是全国机电排灌工作的第一部较全面、较系统的技术规范。它包括泵站设计、施工、安装、验收和技术管理等五个单项规范组成。自1983年8月在甘肃省兰州会议上拟定“技术规范编写大纲”,明确分别由江苏、湖北、甘肃三省为主编单位以来,历时二年的调研、资料收集和编写工作,于1985年8月在昆明会议上进行了初稿审查。紧接着《泵站设计规范》又于同年12月在烟台召开了修改稿的审查会议。
The “Pumping Station Technical Specifications”, jointly prepared by the Ministry of Water Resources and Hydropower Planning and Design Institute and the Farmland Hydraulic Engineering Department, is the first comprehensive and systematic technical specification for mechanical and electrical drainage and irrigation in China. It includes the pump station design, construction, installation, acceptance and technical management of five individual specifications. Since August 1983, at the meeting in Lanzhou, Gansu Province, it has drafted a “Technical Specifications Compilation Outline”, which clearly lasted two years since its publication in Jiangsu, Hubei and Gansu provinces as its chief editor. The data collection and compilation took place in August 1985 A preliminary review was conducted at the Kunming meeting. Followed by “Pumping Station Design Code” in December the same year held a revised version of the review meeting in Yantai.