在郑西铁路客运专线试验段基床底层水泥改良土的填筑过程中,发现水泥改良土随室内击实延迟时间的增长最大干密度降低,而最优含水率增加。通过深入研究发现,这与水泥改良土加固机理有关,因此水泥改良土压实系数的检测应考虑此现象。建议施工现场提高工作效率,尽可能在水泥初凝前碾压完;另一方面应根据现场碾压延迟时间,确定室内击实延迟时间,用相应的最大干密度对压实标准进行控制。 During the filling process of the cement-modified soil at the bottom of the bed in the test section of Zhengzhou-Xi’an Railway, it was found that the maximum dry density of cement-modified soil decreased with the increase of the indoor compaction delay time, and the optimum moisture content increased. Through in-depth study found that this is related to the cement-reinforced soil reinforcement mechanism, so cement compacted soil compaction test should take this phenomenon into account. It is suggested to improve work efficiency at the construction site and finish the rolling before the cement is set as far as possible. On the other hand, the delay time of the compaction in the field should be determined according to the rolling delay on site, and the compaction standard should be controlled with the corresponding maximum dry density.
其他文献
根据三峡右岸地下电站土石方工程施工特点,提出施工期间测绘保障的重点为施工控制网的复测及加密,主厂房、引水洞及尾水隧洞开挖体形的控制,金属结构及其安装控制点的检测等。三峡集团公司测量中心合理布设、加密控制网点,及明向施工、监理单位发布检测成果,为地下电站工程施工的顺利进行和建构筑物及金属埋件的精度控制创造了条件。
现场监控量测是隧道新奥法施工的三大要素之一,是复合式设计、施工的重要环节。介绍了合武客运专线大别山隧道穿越Fd7富水大断层施工现场监控量测工作,对监控量测得到的数据
【摘 要】 本文主要讲述要想做好高中英语课堂教学改革,应该从这几个方面进行,首先要明确高中英语课堂教学的目的及其意义,其次确定高中英语课堂教学改革的指导思想,然后从步骤方面进行了阐述。  【关键词】高中英语;课堂教学;改革  随着英语高效课堂教学改革向纵深发展,教师必须研究新课程的理念如何真正转化为促进学生发展的实践,进而提高课堂教学的效率。在英语课堂教学改革中应该说具体的方法、方式多种多样,作为
【摘 要】实践教学是培养学生的实践动手能力、理解和巩固课程理论知识的重要环节。根据作者多年从事地理信息系统原理(Geographical Information System,GIS)实践教学的经验,以桂林理工大学为例,分析该课程实践教学中存在的主要问题,研究探讨了实践教学改革的思路与措施,以期为GIS人才培养提供参考。  【关键词】地理信息系统原理;实践教学;教学改革  地理信息系统(GIS)是