在广东第二核电站确定在深圳市岭澳地区建设后, 广东省电力设计研究院进一步分析了岭澳地区内各候选地点的特点, 果断地提出厂址由原先推荐的岭澳东移至岭澳西, 并据此完成了项目的可行性研究。实践证明: 厂址转移工作是成功的, 将带来巨大的社会效益。特大型工矿企业的定位是基本建设中的一项战略部署, 本文以岭澳核电站为例, 就厂址转移的原因、工作思路及工作过程作了具体的论述
After Guangdong No.2 Nuclear Power Station confirmed the construction of the Ling’ao area in Shenzhen City, Guangdong Electric Power Design and Research Institute further analyzed the characteristics of the candidate locations within the Ling’ao area and decisively proposed that the site be relocated eastwards from Ling’ao East to Ling’ao West , And completed the project feasibility study accordingly. Practice has proved that the site transfer work is successful and will bring huge social benefits. The positioning of large industrial and mining enterprises is a strategic deployment in capital construction. This paper takes Ling Ao Nuclear Power Station as an example to elaborate on the reasons, working ideas and working process of the site transfer