作为国家重大战略性工程项目南水北调工程,目前正在紧锣密鼓地进行中。为保证总长度约1277km河渠挖掘的精度及多项高标准作业要求,指挥部适时引入摩巴Moba-2Xsite挖掘机辅助系统为施工挖掘机配用。Moba-Xsite挖掘机辅助系统系列分为Xsite-Easy、Xsite-Link和Xsite-Pro三种型号。此次工程中使用的Moba-Xsite-Link即Vision-Link辅助系统。该系统安装便捷,无需在机身动臂上打孔或焊接,无需对挖掘机进行任何改装。通过安装在挖掘机上传
As a major national strategic project of South-North Water Diversion Project, it is currently being conducted in full swing. In order to ensure the accuracy of excavation of a total length of about 1277km river channel and a number of high-standard operating requirements, the Command timely introduced the Maba Moba-2Xsite Excavator Assist System for the construction excavator. The Moba-Xsite Excavator Assist System is available in three models: Xsite-Easy, Xsite-Link and Xsite-Pro. The Moba-Xsite-Link Vision-Link Auxiliary System used in this project. The system is easy to install and eliminates the need to punch or weld the boom of the fuselage without any modifications to the excavator. Upload by installing on excavator