论文部分内容阅读
经国务院批准,中国参加第十四届国际大坝会议代表团在李鹗鼎同志(国际大坝委员会副主席、中国大坝委员会副主席)率领下,一行5人于4日24日至5月25日赴巴西参加了三个会议,并进行了参观.4月25日至27日参加了巴西大坝委员会组织的深窄峡谷建坝设计布置问题国际讨论会.会前,马君寿同志送交了题为“高水头大流量深峡谷水电站溢洪布置及消能”的论文.会上,李鹗鼎同志做了“中国水电建设中深窄峡谷建坝的一些经验和问题”的专题报告.在讨论中,沈崇刚同志和张振邦同志分别作了“中国的过水围堰”和“龙羊峡枢纽的施工导流”两个简短发言.这些专题报告和发言受到了与会代表的重视和欢迎.此外,巴西、美国、苏联、法国、西
With the approval of the State Council, China’s delegation to the 14th International Conference on Dams, led by Comrade Li Dingding (Vice Chairman of International Commission on Dams and Vice Chairman of China’s Dams Committee), took a group of 5 from 4 to 4 April On the 25th, he attended three meetings in Brazil and made his visit, and from April 25 to 27, he participated in the International Symposium on the Design and Construction of Deep Narrow Gorge Dam organized by the Brazilian Dam Commission. Before the meeting, Comrade Ma Junshou sent Entitled “High head flow at the Grand Canyon Power Station spillway layout and energy dissipation.” At the meeting, Comrade Li Ding Ding made a “China Hydropower Construction in the narrow valley dam some experience and problems,” the special report at During the discussion, Comrade Shen Chonggang and Comrade Zhang Zhenbon made two brief speeches respectively on “China’s Overcadding Cofferdam” and “Construction Diversion at Longyangxia Hub.” These special reports and speeches have received the attention of the delegates and their welcome. Brazil, the United States, the Soviet Union, France, and the West