论文部分内容阅读
文章对达克曲克水电站溢洪道进口体型原设计方案进行优化,推算进口导墙控制方程,保证水流平顺稳定进入泄槽,满足溢洪道正常使用。
The article optimizes the original design of the spillway inlet shape of the Dukequ’er Hydropower Station, and calculates the governing equation of the inlet guide wall so as to ensure the smooth and steady flow of water into the sump, so as to meet the normal use of the spillway.