一、概述新海发电厂为一中压凝汽式电厂,总容量8.6万千瓦,装有2.5万千瓦×2,1.2万千瓦×1,6000千瓦×4机组共七台。为解决附近一些化工单位用汽,采用多机抽汽供热,虽提高了机组的热经济性,但为了满足用户的供热量和供汽压力,抽汽供热机组的强迫电负荷甚大,影响机组的电负荷调节。为解决上述存在问题,将一台6000千瓦机组作供热改造的试点。其改造方案简述如下:增开抽汽口以扩大供热量,非调节各级堵去大部份喷咀以减少排汽量和满足其供热压力,停用循环水并降低真空在凝汽器内加热全厂补给水和邻机部份复水。
I. Overview Xinhai Power Plant is a medium-pressure condensing power plant, with a total capacity of 86,000 kilowatts, equipped with 25,000 kilowatts × 2,1.2 million kilowatts × 1,6,000 kilowatts × 4 units a total of seven units. In order to solve the problem of using steam in some chemical units nearby, adopting multi-machine extraction and heating, although the thermal economy of the unit is improved, in order to meet the heat supply and steam supply pressure of the user, the forced electric load of the extraction and heating unit is very large, Affect the unit’s electric load regulation. In order to solve the above problems, a 6,000-kilowatt unit will be used as a pilot for heating retrofit. The reconstruction program is summarized as follows: increase the exhaust port to expand the heat supply, non-regulating block all levels of nozzle to reduce the amount of exhaust and to meet the heating pressure, stop circulating water and reduce the vacuum condensate Steam inside the whole plant heating water and adjacent parts of the rehydration.