论文部分内容阅读
该文通过工程实例介绍了新近堆积土地基采用否实水泥土桩进行加固,加固后的复合地基经检测完全满足要求,根据检测结果和其它工程实践,对影响成桩质量的因素进行了分析总结。
In this paper, an engineering example is used to introduce the reinforcement of the newly-accumulated soil foundation with a cement-soil pile, and the reinforced composite foundation has been fully tested to meet the requirements. According to the test results and other engineering practices, the factors affecting the quality of the pile are analyzed and summarized. .