论文部分内容阅读
如何以尽量少的工程耗费和设备金属耗量,尽量多地开发水力自然资源的问题,一直是水电建设中长期追求的技术经济目标。我们幅员广大的社会主义祖国,面临着开发世界上无与伦比的富饶的水力资源的灿烂前景。多少年来,我国工程技术界,在战无不胜的毛泽东思想指导下,在党的“多快好省建设社会主义”总路线的鼓舞下,对之进行了卓有成效的工作,取得了可喜的成果。就机械设备而言,有的已正式用于社会主义建设工程。例如:混流式HL001号转轮用于大型电站。有的将在逐步完善的基础上,陆续可望用于工程实践中去。其中包括在大跃进年月里,《长江流域规划办公室》等主管部
How to minimize the project cost and equipment metal consumption, as much as possible to develop the hydraulic natural resources, has been the hydropower construction in the long-term pursuit of technical and economic goals. Our vast and vast socialist motherland faces the brilliant prospect of developing incomparable and abundant water resources in the world. In the past few years, under the guidance of Mao Zedong Thought, which is invincible, our engineering and technical community has made remarkable achievements under the guidance of the party’s general line of “building a socialist society that is multi-pronged and good-natured” and has achieved fruitful results. In terms of machinery and equipment, some have been formally used for socialist construction projects. For example: Francis HL001 runner for large power plants. Some will gradually improve on the basis of one after another is expected to be used in engineering practice. These included the Department of Planning, the Yangtze River Basin Planning Office and other ministries during the Great Leap Forward